SAP QM (Quality Management) Training

Syllabus, Career Roadmap & Real-Time Error Solving

1. Detailed QM Training Syllabus

Master Data & Planning

  • Quality Management Enterprise Structure Setup
  • Material Master Integration with QM Views
  • Quality Info Record (Q-Info Record) for Procurement
  • Quality Planning (Inspection Plan & Inspection Characteristics)
  • Master Inspection Characteristics (MIC)
  • Sampling Procedures and Dynamic Modification Rules
  • Quality Notifications (Q1, Q2, Q3 types)

Inspection & Control

  • Inspection Lot Creation (GR, Production, SD Delivery)
  • Result Recording (T-Code: QE01)
  • Usage Decision (UD) and Stock Postings (T-Code: QA11)
  • Quality Certificates and Reporting
  • Integration with MM (Procurement Inspection)
  • Integration with PP (In-Process/Final Inspection)
  • Quality Control Tools (Control Charts)

2. QM Career Roadmap

Phase 1: Foundation (1-3 Months)

Master Quality Master Data (MIC, Inspection Plan) and the full Inspection to Usage Decision process flow.

Phase 2: Practice & Certification (4-6 Months)

Practice complex sampling methods, master QM integration errors (MM/PP integration) (Section 3), and aim for SAP Global Certification.

Phase 3: Job Role (6+ Months)

Start as a Junior QM Consultant, specializing in master data maintenance, handling quality notifications, and supporting inspection processes.


3. Common Real-Time QM Errors & Solutions 🚨

Critical troubleshooting for quality planning and execution.

Error 1: "No Inspection Lot created for Goods Receipt"

Scenario:

A Goods Receipt (MIGO) is posted, but the system fails to create an Inspection Lot for quality check.

Solution (T-Code: MM02 / QI01):

Check the Material Master QM View (MM02) to ensure the correct Inspection Type (e.g., 01 for GR) is active. Also, check the Quality Info Record (QI01) to ensure a block or release status is correctly set for the vendor/material combination.

Error 2: "System status is not set to Results Recording"

Scenario:

User cannot record inspection results because the Inspection Lot is still in 'Released' status but not yet ready for results input.

Solution (T-Code: QA02):

Check the Inspection Lot in (QA02) (Change Inspection Lot). Ensure an Inspection Plan is assigned and the lot has been completely released. If the problem persists, check the settings for the Inspection Type.

Error 3: "Stock posting not possible with current Usage Decision"

Scenario:

After recording results, the user tries to make a Usage Decision ((QA11)) but cannot post the stock (e.g., from Quality to Unrestricted).

Solution (T-Code: QS51):

Check the settings for the Selected Set (Usage Decision codes) in Customizing. In (QS51) (Maintain Selected Set), ensure that the chosen Usage Decision code (e.g., 'A' for Accept) has the correct follow-up action configured to allow the desired stock posting.